BOOSTER FAN HTLT SUBSTATION INSTALLATION

DENDROBIUM

Installation and commissioning of the 2 HTCB, and their associated inter-tripping control for the HT UG reticulation system and control between the 2 UG Booster fans at site. The overall installation included 6476m of cable run, over 1400 terminations, ferruled and wire numbered, 260 Stainless steel tags for cable and DP tubing identification, 74 environmental monitoring instruments with inclusive double redundancy for calibrations, and back-up system, 11 communication systems, 13 power system cables, and the remainder being instrumentation and control systems. Each circuit is then tested and commissioned individually to ensure that all control functions operate as intended.